Investor Update
Evin at Oconomowoc · Phase II · Oconomowoc, WI
Contact investor@matterdevelops.com if you need access.
Investor Update · Phase II Under Construction

Evin at Oconomowoc
Senior Living

1101 Silver Lake Street  ·  Oconomowoc, WI 53066  ·  Quarter II 2026

61 · 54 · 22
IL · AL · MC Units (Campus at Completion)
54 Units
Phase II Expansion
Dec 2026
Projected Building Turnover
Evin at Oconomowoc — Phase II Rendering
Scroll to explore
Asset Overview

An award-winning Lake Country senior living community
— now under construction on Phase II

★ Recognition
2021 ASID Design Excellence Award  ·  2023 Milwaukee Journal Sentinel Top Choice Finalist, Retirement 55+ Community
Project
Evin at Oconomowoc3-Story IL/AL/MC Phase I with Phase II Addition Connected via Skywalk
Location
1101 Silver Lake Street, Oconomowoc, WI 53066 ↗ Lake Country submarket — Waukesha County
Total Units
137 UnitsCampus Total at Completion — Includes the 54-Unit Phase II Expansion (IL/AL, RCAC-Licensed)
Site
6.7 Acres (Shared Campus)Phase I used approximately half the parcel; the Expansion uses the remainder
Developer & Operator
Matter DevelopmentDeveloper — matterdevelops.com ↗Koru Health (KMJV Operating LLC)Operator — 1,142 units managed across WI & MN
Expansion Completion
December 2026 General Contractor: Catalyst ConstructionProjected
Featured Photos

Construction Progress Feature Photos

Aerial View — Building Exterior & Site, Looking Southeast
Aerial View — Building Exterior & Site, Looking Southeast
Aerial View — Phase II Connecting to Phase I
Aerial View — Phase II Connecting to Phase I
Aerial View — Connector Bridge & Front Entrance
Aerial View — Connector Bridge & Front Entrance
Investment Highlights

Expanding a proven community in one of
Lake Country's most affluent submarkets

Total Development Budget
$42.0M
Phase I — Complete$20,810,931
100% of $20,810,931 Phase I budget
Phase II — Under Construction$9,169,097
43.2% of $21,226,291 Phase II budget
Total Equity
$12.0M
$5.21M Class A equity (Phase I)
$6.80M Class C equity (Phase II)
Investment Returns
14.3%
Average annual cash-on-cash return — 25.87% IRR — targeting a hold through approximately July 2028
Preferred Return
Class A
10%
Class C
4% 8%
Class A: 10.0% annually, flat, with no construction step-up
Class C: 4.0% during construction, stepping to 8.0% at certificate of occupancy
Total Mortgage Debt
$16.6M
$13,868,570 A-Note (Phase I) — Q2 2026 ending balance
B-Note (Phase II Construction Loan)$2,775,321
17.9% drawn of $15,506,171 max drawdown — Q2 2026 ending balance
Phase I Track Record
4.5 Yrs
Evin's first phase has sustained high occupancy for 4.5 years since opening in October 2020
01
The Opportunity

Oconomowoc's Lake Country submarket combines a median household income of $109,971 (3-mile radius) with an adult-child median income of $133,599 — among the area's most affluent demographics, with 68.5% of households earning $100k+. Evin's existing waiting list for both IL and AL units signals durable, unmet demand for the Expansion's 54 new units.

02
The Community

The Expansion adds 54 senior living apartments across three stories, connected to the existing Phase I building by a second-story skywalk for operational efficiency. New amenities include fitness equipment, a golf simulator, a creative classroom, club room, dining room, bistro/coffee-to-cocktails bar, rooftop patio, salon, walking path, and pickleball courts — while sharing Phase I's existing commercial kitchen. Units feature granite countertops, in-unit washer/dryers, and private balconies.

03
Proforma Stabilization

Consolidated campus occupancy is forecast to dip to 69.4% in 2026 as the new 54 units come online, before stabilizing to 93.8% by 2027 and 2028. Net Operating Income grows from $2.30M in 2025 to $4.71M by 2028 — a 46.1% operating margin.

04
Rate Positioning

Expansion rates — including rent, utilities, cable/internet, and a package of personal and health-monitoring services — are projected to average $6,653 per month. Eight comparable communities sit within a few miles of the submarket, but none combine Evin's connected IL/AL/MC continuum, newly built product, and established 4.5-year operating track record.

Current Operations

Evin at Oconomowoc has operated at a sustained high
occupancy for more than four years.

Phase I Occupancy
96.3%
Current run-rate occupancy — sustained at a high level since opening in October 2020, across IL, AL, and MC.
2025 Net Operating Income
$2.08M
37.4% operating margin on $5.57M of total revenue — up from $1.67M of NOI in 2022, a 24.6% increase over three years.
Waiting List
IL & AL
Evin maintains a lengthy waiting list for both Independent Living and Assisted Living, supporting a fast lease-up forecast for the Expansion's 54 new units.
Year-to-Date Performance — Through May 2026
YTD Revenue
$2.34M
January–May 2026
YTD Operating Expenses
$1.54M
65.9% of revenue
YTD Net Operating Income
$798.9K
34.2% margin
4-Year Historical Operating Performance 2022 Actual 2023 Actual 2024 Actual 2025 Actual
Total Revenue $4,506,213 $4,902,904 $5,312,865 $5,572,542
Operating Expenses $2,834,696 $2,930,747 $3,300,788 $3,490,370
Net Operating Income $1,671,517 $1,972,157 $2,012,078 $2,082,171
NOI Growth (YoY) +18.0% +2.0% +3.5%
Marketing Update

Strong pre-leasing demand ahead of the
Expansion's planned opening

Brand & Recognition
Active

Evin has been recognized with a 2021 Design Excellence Award from the American Society of Interior Designers (ASID) and was a 2023 Top Choice Finalist for the Milwaukee Journal Sentinel in the Retirement 55+ Community category. The Expansion carries forward the same architecture and the brand the market already knows.

Operator Continuity
Active

The Expansion will continue to be operated by Koru Health, the closely-held affiliate of Matter Development that has operated Phase I since its 2020 opening and now operates 15 senior living communities across Wisconsin and Minnesota.

Competitive Position
Strong

Eight senior living communities sit within a few miles of Evin's campus, but none combine a connected IL/AL/MC continuum with newly built product and a 4.5-year track record of sustained high occupancy on the same site.

Demand Pipeline
Strong Pre-Leasing

Evin's existing waiting list for IL and AL units gives the Expansion a built-in pipeline of qualified prospects before construction is even complete, principally for the 54 new units, which will focus on assisted living.

Construction Update

Week ending June 26, 2026
& recent progress

Project Milestone Progress
As of June 2026  ·  Turnover: December 23, 2026
Now
Sitework & Foun­dations
Jul '25–Jan '26
✓ Complete
Structural Framing (All Floors)
Jan–Apr '26
✓ Complete
Roof Installation
Apr–Jul '26
✓ Complete
Masonry & Exterior Enclosure
May–Nov '26
▶ In Progress
Interior Finishes & MEP
Jun–Dec '26
In Progress
Final Inspections & Punch­list
Dec '26
Upcoming
Turnover & Licensure
Dec 23, 2026
◆ Target
Progress Timeline — Quarter II 2026
June 2026
Brick Veneer, Drywall & First Mock-Up Unit
Stone and brick veneer progressing across the southwest corner and front entrance. 2nd floor gypcrete poured; drywall and taping underway on both 2nd and 3rd floors, with paint following on the 2nd floor south units. 3rd floor flooring and trim began ahead of schedule, including the first finished mock-up unit. 1st floor plumbing, HVAC, sprinkler, and electrical rough-in underway throughout the month.
May 2026
Brick Installation Begins & 3rd Floor Drywall
Brick masonry started on the east and south elevations. Patio doors and windows set, with frames, glass, and caulking completed by Corcoran. Drywall substantially completed and taping started across 3rd floor units. Flat roofing finished at the connector bridge and 2nd floor, and insulation progressed on the 3rd floor north end.
April 2026
Roof Trusses, Storefront Framing & Connector Bridge
Roof trusses and sheeting set across the building, with shingle and flat roofing started. Storefront and front entrance framing completed, along with steel decking on the connector bridge tying into Phase I. MEP rough-in continued on the 3rd floor, exterior wall sheathing and Tyvek wrap progressed, and stoops were formed and poured.
Most Recent Update
Week Ending 6/26/2026
  • Blocking, Soffit & Trim on 3rd Floor
  • Plumbing, HVAC, Sprinkler & Electrical Rough-In on 1st Floor
  • Drywall & Taping on 2nd Floor
  • Paint on 2nd Floor South Units
  • Flooring & Mock-Up Unit on 3rd Floor
  • Brick Masonry on Southwest Corner & Trash Enclosure
Look Ahead — Next 4 Weeks
  • MEP Rough-In, 1st Floor
  • Installing Brick & Siding
  • Taping 2nd & 1st Floor Drywall
  • Hanging 1st Floor Drywall
  • Installing Flooring, 2nd Floor
  • Trim Carpentry, 3rd Floor
Questions? Reach out directly.
Matter Development
investor@matterdevelops.com
2675 N Mayfair Road, Suite 200  ·  Wauwatosa, WI 53226
Managing Director & Founder, CEO
Aaron R. Matter
414-409-1295
aaron@matterdevelops.com